In a significant development for Ogun State and Nigeria’s aviation industry, Gateway International Airport (GWI), located in Iperu-Remo, officially began scheduled commercial flight operations. This happened on Tuesday, October 7, 2025.

The inaugural ValueJet flight to Abuja took off in the late morning, despite inclement weather conditions. This signified the commencement of regular passenger services. Passengers were observed lining up at the terminal for check-in. The heavy rain did not faze them.

Operations, Schedule & Certification

The outbound flight took off from the new airport at approximately 10:10 am. It carried around 90 passengers.

Return flights from Abuja to GWI will depart at 4:00 p.m. Tuesday and Thursday. The estimated arrival time is 5:15 p.m.

The Nigeria Civil Aviation Authority (NCAA) issued an Aerodrome Operational Permit to the airport. They designated it with Aerodrome Reference Code 3C and an Aircraft Rescue and Firefighting Services (ARFFS) Category 6 rating.

Reports indicate that GWI will conduct daytime flights from sunrise to sunset. It will utilize a non-precision approach for Runway 05/23. It will also provide support for Area Navigation (RNAV) procedures.

Political & Regulatory Context

Governor Dapo Abiodun described the launch as a “historic milestone.” He said this not just for Ogun State, but for Nigeria’s aviation infrastructure as a whole. He noted that this marks “the first time a newly constructed airport in the country has obtained certification under current regulatory standards.”

Governor Dapo Abiodun welcomed the Director General of the NCAA, Captain Najomo, during a recent meeting in Abeokuta. They discussed reforms in the aviation sector. They also talked about the role of GWI in promoting economic development. He noted that regulatory bodies commended the airport for its contemporary infrastructure and preparedness during site evaluations.

Significance & Outlook

The start of commercial operations at GWI is anticipated to enhance connectivity. It will also generate jobs and attract investment in Ogun and surrounding states. Governor Abiodun additionally disclosed that the airport is an integral component of a comprehensive multimodal transport master plan. This plan connects road, rail, air, and water systems.

NCAA officials have reportedly referred to GWI as a standard for future aviation infrastructure throughout Nigeria. They highlighted its adherence to regulations and readiness for operations.

At this moment, GWI is entering a pivotal stage. It must demonstrate its ability to uphold dependable operations. It also needs to ensure safety and regulatory compliance. Furthermore, it must draw in additional routes. However, its inaugural commercial flight, taking off in the midst of rain and elevated hopes, heralds a bright new beginning for Ogun’s aspirations in aviation.

ALSO WATCH MARKETING EDGE ONTV